Maximum visibility, impactful design, tournament-level performance.
Super panoramic padel court in laminated glass
Ready for any climate
Obstacle-free design for an immersive playing experience
Designed to last
Technical features
Steel structure
Reinforced corner posts
Laminated glass
Clear view
Wind resistance
Outdoor 25–28 m/s
PLUS version hot-dip galvanized after welding
From design to first exchange, step by step
Padel court installation: every phase of the process
Step 1
Analysis and Feasibility
Technical evaluation of the land and verification of project compliance.
Step 2
Design and Permits
Development of the executive project and obtaining the necessary authorizations for the works.
Step 3
Base Preparation
Construction of the concrete slab or assembly of the prefabricated base, according to specific needs.
Step 4
Surface Control
Verification of leveling, roughness, and correct slopes of the playing slab.
Step 5
Structural Assembly
Field tracing, installation of metal structure, tempered glass, and synthetic turf.
Step 6
Finishing and Completion
Professional carpet brushing and installation of the game net.
Step 7
Official Approval
FITP and CONI certification for competitive use of the padel court.
Customize your field
Customizations can be defined during the design phase or added after the field is assembled. Some options, like extra series colors or the choice of synthetic grass type, must be agreed upon before construction, while others—such as accessories, protections, or aesthetic details—can be integrated later, adapting to the client’s needs over time.
Customize your field
Discover all our solutions
Other tailor-made solutions for you
Our Partners








