OUR PADEL COURTS

Panoramic Line

Solid structure, essential design, and unobstructed visibility: our Panoramic line is designed for those who want to offer a complete and professional playing experience, both outdoors and indoors.

Ready for any climate

Panoramic Outdoor

Designed for outdoor environments, the Panoramic Outdoor ensures great resistance against wind stress. The architecture without side posts enhances the aesthetics of the court and the visibility of the game, while the reinforced structure ensures long-term reliability.

Single Panoramic Outdoor Court
Double Panoramic Outdoor Court
Single Panoramic Indoor Court
Double Panoramic Indoor Court

Perfect visibility, guaranteed solidity

Panoramic Indoor

The court structure is designed to offer maximum stability and visibility. The corner posts, combined with the metal beams running along the upper perimeter of the glass walls, ensure high rigidity and optimal resistance to game stress, while maintaining a wide and unobstructed view of the playing area.

The Panoramic Indoor models are designed for installation in covered environments, even with movable, sliding, or liftable walls, ensuring reliable structural integrity in any configuration.

Designed to last

Technical features

Steel structure

Reinforced corner posts

Laminated glass

Clear view

Wind resistance
Outdoor 25–28 m/s

PLUS version hot-dip galvanized after welding

From design to first exchange, step by step

Padel court installation: every phase of the process

Step 1

Analysis and Feasibility

Technical evaluation of the land and verification of project compliance.

Step 2

Design and Permits

Development of the executive project and obtaining the necessary authorizations for the works.

Step 3

Base Preparation

Construction of the concrete slab or assembly of the prefabricated base, according to specific needs.

Step 4

Surface Control

Verification of leveling, roughness, and correct slopes of the playing slab.

Step 5

Structural Assembly

Field tracing, installation of metal structure, tempered glass, and synthetic turf.

Step 6

Finishing and Completion

Professional carpet brushing and installation of the game net.

Step 7

Official Approval

FITP and CONI certification for competitive use of the padel court.

Padel courts constructed
+ 0
Countries where we operate
+ 0
Years of experience
+ 0

Customize your field

Customizations can be defined during the design phase or added after the field is assembled. Some options, like extra series colors or the choice of synthetic grass type, must be agreed upon before construction, while others—such as accessories, protections, or aesthetic details—can be integrated later, adapting to the client’s needs over time.

Customize your field

Customizations can be defined during the design phase or added after the field is assembled. Some options, like extra series colors or the choice of synthetic grass type, must be agreed upon before construction, while others—such as accessories, protections, or aesthetic details—can be integrated later, adapting to the client’s needs over time.

Discover all our solutions

Other tailor-made solutions for you

Our Partners