Minipadel is the court designed exclusively for the younger ones. A facility designed for children and teenagers aged 6 to 14, perfect for introducing them to padel in a safe, stimulating, and child-friendly environment.

Same quality, reduced size

Built like a professional court, designed for the little ones

Minipadel incorporates the technical features of WePadel’s regulation courts, maintaining high standards of durability, safety, and longevity. The structure is made of galvanized steel, with safety glass and certified shock-absorbing synthetic grass carpet. Nothing is left to chance: every detail is designed to offer an authentic playing experience, but on a smaller scale.

Where it can be installed

Perfect for schools, parks, community centers, and sports facilities

Thanks to its compact size, Minipadel is the ideal solution for educational and recreational contexts: schools, municipal areas, parishes, sports centers, and even private facilities that want to enrich their offerings with an activity designed for children and teenagers. The court can be installed both indoors and outdoors, adapting to any available space.

More users, more activities, more opportunities to stand out

An investment that generates value

Adding a Minipadel to your facility means attracting new user segments, offering junior courses, organizing family events, and increasing space usage during less traditional hours. It is also an excellent opportunity to create pathways to padel, building loyalty among the younger generation and introducing them to sports practice from an early age.

Step 1

Analysis and Feasibility

Technical evaluation of the land and verification of project compliance.

Step 2

Design and Permits

Development of the executive project and obtaining the necessary authorizations for the works.

Step 3

Base Preparation

Construction of the concrete slab or assembly of the prefabricated base, according to specific needs.

Step 4

Surface Control

Verification of leveling, roughness, and correct slopes of the playing slab.

Step 5

Structural Assembly

Field tracing, installation of metal structure, tempered glass, and synthetic turf.

Step 6

Finishing and Completion

Professional carpet brushing and installation of the game net.

Step 7

Official Approval

FITP and CONI certification for competitive use of the padel court.

Padel courts constructed
+ 0
Countries where we operate
+ 0
Years of experience
+ 0

Customize your field

Customizations can be defined during the design phase or added after the field is assembled. Some options, like extra series colors or the choice of synthetic grass type, must be agreed upon before construction, while others—such as accessories, protections, or aesthetic details—can be integrated later, adapting to the client’s needs over time.

Customize your field

Customizations can be defined during the design phase or added after the field is assembled. Some options, like extra series colors or the choice of synthetic grass type, must be agreed upon before construction, while others—such as accessories, protections, or aesthetic details—can be integrated later, adapting to the client’s needs over time.

Discover all our solutions

Other tailor-made solutions for you

Standard

Superpanoramic

Panoramic

Our Partners